BIM.Technologies were appointed to create, implement and manage the BIM process for the client on this prestigious project in central London.

Working with an established design team, we created and implemented a BIM protocol, and defined the project BIM Execution Plan. Further to this, we were responsible for the creation of the architectural BIM that was subsequently coordinated with the structural and services design models to form a coordinated project BIM. Working with the appointed contractor, we have integrated the logistics and construction sequence to take the coordination BIM to the fourth dimension - a fully sequenced construction model. 

This model was used during the construction phase to run coordanation workshops and BIM.technologies assisted with the implmentation of sub contractors and trade into the federated BIM, while utilising the 4D to drive look ahead meetings.

BIM.Technologies are now assisting the FM provider and end user use the all data collected in the model during the design and construction for operational purpouses, minimising manual imput.